Handwerker Costa Blanca
Craftsman's work on the Costa Blanca — a reference project by Handwerker Costa Blanca
Areas covered

Builder in Torrevieja

Renovations, bathrooms, façades and pools in Torrevieja — from a German builder who lives a few kilometres up the road and speaks your language.

I usually reply within 15 minutes.
★★★★★ 5,0 on Google Over 20 years in the trade Getting there: around 15 minutes from my base in La Zenia Usually a reply within 15 minutes
On site

What I do in Torrevieja

Torrevieja has grown like hardly any other place along this coast: first the salt harbour, then from the seventies onwards block after block of apartment buildings, later the urbanisations inland. That shapes the work here. I rarely deal with new builds, almost always with flats and bungalows that have thirty or forty years behind them — and I know exactly where the trouble spots are.

In Torrevieja the salt comes from two sides: from the sea and from the salt lakes behind the town. Anyone painting a façade, coating a metal railing or laying pool coping here is working against a level of exposure that doesn't exist thirty kilometres inland. That's why on the coast it's almost always the preparation and the material that decide whether a job lasts five years or one summer.

From La Zenia I can be with you in a quarter of an hour. That sounds like a detail, but it's the reason why I also take on jobs in Torrevieja that wouldn't pay for a firm coming from Alicante — and why I don't have to put a site visit off until the week after next.

Request a quote
Completed project by Handwerker Costa Blanca
Local knowledge

What's different in Torrevieja

Apartments from the building boom

Flats from the seventies to the nineties: pipes buried in the plaster, bathrooms without a level-access shower, terrazzo floors, electrics at their limit. Almost every renovation here starts with us taking an honest look at what's behind the tiles.

Salt from two sides

The sea in front, the salt lakes behind. Render sands off, aluminium blooms, railings and roller-shutter boxes rust from the inside out. With the right substrate build-up and coast-proof materials it's manageable — with DIY-store paint it isn't.

Urbanisations inland

Los Balcones, La Siesta, Torreta, El Chaparral, Aguas Nuevas: bungalows and terraced houses with small gardens, often with a communal pool. Different questions from those in town — terrace, screening, air conditioning, solarium on the roof.

From practice

What I deal with most often in Torrevieja

  • Complete new bathroom — a 1980s apartment, including pipework and waterproofing
  • Terrazzo floor out, new tiles or vinyl throughout the flat
  • Façades and external walls: opening up cracks, rendering, coastal-grade painting
  • Replacing the kitchen, moving the connections, fitting the appliances
  • Air conditioning and electrics done as part of the renovation
  • Terraces, pool coping and privacy screening in the urbanisations
Before / after

The jobs that come up here

All photos are from my own projects on the Costa Blanca — drag the slider.

Bathroom renovation — completely rebuilt

Stripped back to the bare shell: new pipework, waterproofing, tiling, shower and units — a completely new bathroom.

To the service
Before: Bathroom renovation — completely rebuilt
After: Bathroom renovation — completely rebuilt — carried out by Handwerker Costa Blanca After
Before

Kitchen — from bare shell to finished kitchen

Completely stripped back, new connections and electrics, floors laid and the fitted kitchen installed — all from a single source.

To the service
Before: Kitchen — from bare shell to finished kitchen
After: Kitchen — from bare shell to finished kitchen — carried out by Handwerker Costa Blanca After
Before

Shall I come and have a look at it for you?

Send me 2–3 photos from your phone and a couple of lines — you'll get an honest first assessment, usually within 15 minutes.

Request a quote
Where exactly

In Torrevieja you'll find me working here, among other places

Zentrum & Paseo · Playa del Cura · Los Locos · La Mata · Los Balcones · La Siesta · El Chaparral · Torreta · Aguas Nuevas · Punta Prima

Frequently asked questions

What owners in Torrevieja ask me

How quickly can you be on site in Torrevieja?

I live in La Zenia, which is about fifteen minutes away. For a site visit I can usually find a slot within a few days — and if you send me two or three photos by WhatsApp beforehand, you'll normally get a first assessment within fifteen minutes of whether a visit is worthwhile at all.

My bathroom dates from 1985 and has never been touched. What am I in for?

Usually more than just new tiles — and I'd rather tell you that beforehand than afterwards. What you typically find is old pipework buried in the plaster, waterproofing that simply didn't exist back then, and a waste outlet in the wrong place. That's exactly why I strip bathrooms right back and build them up again: pipework, waterproofing, tiling, sanitaryware. Whatever I see at the survey, I'll tell you straight — even if it works out dearer than you'd hoped.

Do you also work in urbanisations such as Los Balcones or La Siesta?

Yes, that's a good part of my work in Torrevieja. Bungalows and terraced houses have their own issues: terrace and solarium, screening from the neighbours, air conditioning, often a communal pool where I can't touch anything without the Comunidad's approval. Inside your own four walls and on your own terrace, though, we can move quickly.

I let out my apartment. Can you work between two bookings?

If the time frame is realistic, yes — and if it isn't, I'll tell you. A complete bathroom in four days between two arrivals isn't a plan, it's a promise that falls apart. Decorating, floors or smaller repairs, on the other hand, fit well into a changeover week.

Do I need permission from the council for the work?

For most internal work, a notification to the town hall (declaración responsable) is usually enough in Spain; as soon as you touch the structure, the layout or the exterior appearance, it becomes a proper building permit with a technician involved. At the survey I'll tell you which way your project is heading. The application is made by you or your administrator — I'm a tradesman, not an architect.